Small-scale villas on Lombok’s southern coast.

NEWAVES designs, develops and operates boutique hillside villas for investors who want to see the plan, the numbers and the open questions before they commit.

10private-pool villas
6,000 m²hillside site facing the bay
32.5%building coverage, the rest left green or terraced
±24months from survey to opening
Aerial view of Areguling Hills villas on three stone terraces
Current project · concept phase

Areguling Hills

Ten pool villas on three stone terraces, set above the bay and the rice fields of Areguling, South Lombok. Thatched roofs, local stone and timber, and a restaurant and pool club at arrival.

Villas
6 × 100 m² · 4 × 160 m²
Investment (excl. land)
≈ Rp 51.7 billion
Planning yield on cost
≈ 9.4%

Why investors work with NEWAVES

Numbers you can audit

Every figure we publish is labelled as an assumption until it has been checked by a survey, a soil test or a contractor’s quote. You see what is known and what is still open.

Due diligence before design

Land title, zoning (KKPR), geotechnical survey and permits come first. We lock the detailed design only when the ground and the paperwork allow it.

Designed for the slope

Stone terraces turn a steep, eroded hillside into level platforms. The retaining walls are the façade and the erosion control at once.

Light on the land

Only 32.5% of the site is built. Solar power, rainwater harvesting, wastewater treatment and local labour are part of the brief, not an add-on.

Run like a hotel

A private pool in every villa, a shared pool club, restaurant and spa, with on-site staff and monthly reporting to owners.

Built to last in this climate

Deep eaves, a louvred clerestory and cross-ventilation shelter the living space from sun and rain and let hot air escape.

From plot to opening, in four stages

A realistic programme of about 24 months, with earthworks planned for the dry season.

  1. VerifyTopographic and geotechnical survey, land title, permits (months 0–6).
  2. PrepareTerracing, drainage, access and utilities (months 6–11).
  3. BuildTwo construction phases, from the arrival area up the hill (months 9–20).
  4. OpenFurnishing, staff training, trial stays, soft and grand opening (months 17–24).

See the full project dossier

Plans, cost breakdown, planning assumptions and the permit roadmap. Sent on request, with a call if you wish.